Adjust the task sorting method:
1. Enter the "Routine" interface (tab bar at the bottom of the app).
2. Click the three-dot menu in the upper right corner and select "Routine setting".
3. Select the sorting method: "Sort by Time" or "Manual Sorting". - "Sort by Time": Sort by assigned time from morning to night, with "All Day" at the top.
- "Manual Sorting": You can freely drag to adjust the Routine order. Note: For consistency, you cannot use both sorting methods at the same time. Manually dragging in "Time Sorting" will automatically switch to "Manual Sorting". Conversely, switching from "Manual Sorting" to "Time Sorting" will reset the previous manual sorting.
Move completed tasks down and set the start time of the week:
1. Click to enter the profile page.
2. Click the settings icon in the upper right corner
3. Find the "Routine setting" option
- Turn on "Move completed task down" (off by default)
- Set "Week starts on" (select Sunday or Monday)